School Re-Opening Plan Announced
August 4, 2020 -- Regina Public Schools has just released the Fall 2020 School Re-Opening Plan. Based on the Government of Saskatchewan and Response Planning Team guidelines, the Plan can be reviewed here.
August 4, 2020 -- Regina Public Schools has just released the Fall 2020 School Re-Opening Plan. Based on the Government of Saskatchewan and Response Planning Team guidelines, the Plan can be reviewed here.
JUNE 22, 2020 -- Please CLICK HERE for an important message for parents/guardians and students from the Director of Education and Chair of the Board.
As you may be aware, we are in the process of doing renovations in the school to prepare for the new school year. During these renovations, asbestos tile was found in some floor tiles in the building.
Asbestos in tiles is generally safe as long as it is not disturbed/broken up. Unfortunately, during renovations from June 11 to June 16, some of the tile was disturbed. Air samples were taken and revealed there was a small amount of asbestos fibre in the air. The measured sample amount was 0.01 f/cc (fibres per cubic centimetres) which is just over the allowable limits for clean air.
JUNE 17, 2020 -- The 2020-21 school calendar has been revised. Please check out the Calendars tab at www.reginapublicschools.ca or click for individual calendars below.
Please click on the following links to view Dr. A.E. Perry's Supply Lists.
Grade 1-8 English School Supply List
Grade 1-5 French Immersion School Supply List
93 Lincoln Drive
Regina, Saskatchewan
S4S 6P1
Email: draeperry@rbe.sk.ca
Phone: (306) 791-8476
Fax: (306) 523-3031